Agenda and minutes

3rd Calling 24/0002/LRB, Argyll and Bute Local Review Body - Wednesday, 12 June 2024 9:00 am

Venue: By Microsoft Teams

Contact: Hazel MacInnes Tel: 01546 604269 

Items
No. Item

1.

APOLOGIES FOR ABSENCE

Minutes:

There were no apologies for absence.

2.

DECLARATIONS OF INTEREST

Minutes:

There were no declarations of interest.

3.

CONSIDER NOTICE OF REVIEW REQUEST: LAND NORTH OF ROWANBRAE, GLENCRUITTEN, OBAN (REF: 24/0002/LRB)

Minutes:

The Chair, Councillor Kieron Green, welcomed everyone to the meeting.  He explained that no person present would be entitled to speak other than the Members of the Local Review Body (LRB) and Mr Logan, who would provide procedural advice if required.

 

He advised that his first task would be to establish if the Members of the LRB felt that they had sufficient information before them to come to a decision on the Review.

 

Both Councillors Armour and Brown confirmed that they had sufficient information before them to come to a decision on the Review.

 

The Chair advised that at the last meeting the decision of the LRB had been to continue consideration of the Review allow for an opportunity to seek to prepare a competent Motion to justify approval of planning permission in principle.

 

The Chair moved the following Motion –

 

This LRB considers that the proposed outline permission being sought is of a suitable scale, design and use for a countryside location as required by LDP Policy 2. Further, in accordance with LDP Policy 4 the proposal respects the landscape character of the area, and following LDP Policy 5, the siting respects the topography of the area. As set out in LDP Policy 8 this is away from a hilltop, skyline or ridge, and has very limited visibility from the public road. The settlement pattern of the surroundings is also of relevance to the same policy, and is of small cluster of houses, generally well screened, which it is considered this proposal largely follows by being in the vicinity of existing development.

 

It is acknowledged that LDP Policy 5 and NPF Policy 9 encourage the reuse of previously developed land, and more specifically that NPF policy 9(b) does not support development on greenfield sites such as this, unless explicitly supported by policies in the LDP. This LRB notes the housing pressures in the Oban area, as set out in the Housing Needs and Demands Assessment, and that paragraph 3.11 on page 14 of the LDP mentions that Oban itself is “increasingly physically constrained, nearing its natural topographic capacity for growth and development”. It is therefore considered that there is a shortage of previously developed brownfield land suitable for redevelopment, leading to greenfield sites such as this being suitable alternatives to meet demand locally. It is of relevance that NPF Policy 17c states that “proposals for new homes in remote rural areas will be supported where the proposal…supports identified local housing outcomes”

 

The LRB therefore considers that the proposal meets the requirements of all local and national policies, including LDP2 policies , 4, 5 and 8, and NPF policies 4, 9 and 17, and agrees to grant outline planning permission, subject to the conditions appended:-

 

 

CONDITIONS AND REASONS RELATIVE TO APPLICATION REF. NO. 23/00825/PPP

 

Standard Time Limit Condition  (as defined by Regulation)

 

Standard Condition on Soil Management During Construction

 

Additional Conditions

 

 

1.

PPP – Matters Requiring AMSC Submission

 

Plans and particulars of the matters specified in conditions 3, 4, 5, 6, 7 and 9 below shall be submitted by way of application(s) for Approval of Matters Specified in Conditions in accordance with the timescales and other limitations in Section 59 of the Town and Country Planning (Scotland) Act 1997 as amended. Thereafter the development shall be completed wholly in accordance with the approved details.

 

Reason: To accord with Section 59 of the Town and Country Planning (Scotland) Act 1997 as amended.

 

Note to Applicant

 

Regard should be had to Scottish Waters consultation comments in relation to the proposed development which are available to view via the Public Access section of the Council’s website.

 

 

2.

PPP – Approved Details

 

The development shall be implemented in accordance with the details specified on the application form dated 24/04/23 and the approved drawings listed in the table below.

 

Plan Title.

Plan Ref. No.

Version

Date Received

Location and Site Plan

001

B

27/06/23

 

Reason:  To accord with Regulation 28 of the Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2008.

 

 

3.

PPP – Timescale to be Agreed for Completion

 

Pursuant to Condition 1 - no development shall commence until details of the proposed timescale for completion of the approved development have been submitted to and approved by the Planning Authority. Thereafter, the development shall be implemented in accordance with the duly approved timescale for completion unless an alternative timescale for completion is otherwise agreed in writing with the Planning Authority.

 

Reason: In order to comply with the requirements of NPF4 Policy 16F.

 

 

4.

PPP - Design and Finishes

 

Pursuant to Condition 1 – no development shall commence until plans and particulars of the site layout, design and external finishes of the development has been submitted to and approved by the Planning Authority. These details shall incorporate:

 

i)        A statement addressing the Action Checklist for developing design contained within the Argyll and Bute Sustainable Design Guide 2006;

ii)      A statement addressing how the proposed development has been designed to be consistent with the six qualities of successful places, as defined within Policy 14 of NPF4;

iii)     Local vernacular design taking consideration of the guidance set out in the approved Argyll and Bute Sustainable Design Guidance, 2006;

iv)             Maximum of one and a half storeys;

v)               Windows with a vertical emphasis;

vi)      Have a roof pitch between 37 and 42 degrees finished in natural slate or a good quality artificial slate;

vii)   Details of finished ground floor levels relative to an identifiable fixed datum located outwith the application site along with details of the existing and proposed site levels shown in the form of sectional drawings/contour plans/site level survey, or a combination of these;

viii) Details of an area within the application site for the placement of refuse/recycling bins.

ix)    Details of the potential for the installation of a 7kw Electrical Vehicle Charging Point within the site.

 

Reason: To accord with Section 59 of the Town and Country Planning (Scotland) Act 1997 as amended, and in order to integrate the proposed dwellinghouse with its surroundings.  ...  view the full minutes text for item 3.