Report by Head of Development and Economic Growth
Minutes:
The Area Team Leader spoke to the terms of the report and to
supplementary report number 1, which advised of a further submission by an
existing objector. She also advised of a
typographical error at section Q of the report of handling, which indicated
that the proposed development was not consistent with the Development Plan. She confirmed that it should have stated that
the proposed development was consistent with the Development Plan.
The proposed development relates to the erection of a 4 bed detached
dwellinghouse and formation of a new vehicular access.
The site is located within the settlement area of Rhu and lies within
the Rhu Conservation Area and the residential property adjacent to the West “Lagarie House” which is a Category 2B” listed building and
within the vicinity of the Category “A” listed “Ardencaple Hotel”. The site is also covered by a Tree
Preservation Order (TPO).
The proposal is considered to be consistent with the relevant
provisions of the Development Plan and it was recommended that planning
permission be granted subject to the conditions and reasons detailed in the
report of handling.
Decision
The Committee agreed to grant planning permission subject to the
following conditions and reasons:
Standard Time Limit Condition (as
defined by Regulation)
Standard Condition on Soil Management During
Construction
Additional Conditions
1. PP - Approved Details & Standard
Notes – Non EIA Development
The
development shall be implemented in accordance with the details specified on
the application form dated 05.08.2023; , supporting information and, the
approved drawings listed in the table below unless the prior written approval
of the planning authority is obtained for an amendment to the approved details
under Section 64 of the Town and Country Planning (Scotland) Act 1997.
Plan Title. |
Plan Ref. No. |
Version |
Date Received |
Location Plan |
1 of 15 |
A |
22.08.2023 |
Existing Site Plan |
2 of 15 |
A |
22.08.2023 |
Existing Site Cross Section
and Photos - Sheet 1 of 2 |
3 of 15 |
- |
01.08.2023 |
Existing Site Cross Section
and Photos - Sheet 2 of 2 |
4 of 15 |
- |
01.08.2023 |
Proposed Site Plan |
5 of 15 |
B |
29.02.2024 |
Proposed Site Cross
Sections |
6 of 15 |
- |
01.08.2023 |
Proposed Site Cross
Section, Access Wall Elevation and Layout Plan |
7 of 15 |
A |
23.08.2023 |
Proposed Sightline Plan |
8 of 15 |
D |
22.08.2023 |
Proposed Elevations and
Sections |
9 of 15 |
- |
01.08.2023 |
Proposed Floor/Roof Plans |
10 of 15 |
- |
01.08.2023 |
Planning Design and Access
Statement |
11 of 15 |
- |
01.08.2023 |
Tree Survey Report |
12 of 15 |
A |
28.02.2024 |
Bat Scoping Survey Report |
13 of 15 |
- |
28.02.2024 |
Sustainability checklist |
14 of 15 |
- |
12.03.2024 |
Sustainable buildings
checklist |
15 of 15 |
- |
12.03.2024 |
Reason:
For the purpose of clarity, to ensure that the development is implemented in
accordance with the approved details.
2. Sustainable Urban Drainage –
Notwithstanding Condition 1, details of a sustainable urban drainage system compliant
with the guidance set out in CIRIA’s SuDS Manual C753 must be submitted to and
approved in writing by the planning authority prior to construction. The
surface water drainage shall be operational prior to the development being
brought into use and shall be maintained as such thereafter.
Reason: To ensure adequate surface water
drainage is implemented to prevent flooding elsewhere.
3. Landscape
and Biodiversity Enhancement - Notwithstanding Condition 1, No development shall take place until full
details of both hard and soft landscape works to be carried out at the site
have been submitted to and approved in writing by the local planning authority.
The approved hard landscaping works shall be carried out prior to first
occupation of the development and the soft landscaping works within the first
planting season following first occupation of the development. The details
submitted shall include:
- proposed finished site levels or contours;
- hard surfacing materials;
- details of the number, size and location of the
trees, shrubs and plants to be retained and planted together with a planting
specification – these shall include compensatory planting for the trees already
identified as to be removed as part of the development;
- details of measures to enhance biodiversity within
the site;
- location and design, including materials, of
walls, fences and gates;
-
programme for completion and subsequent on-going
maintenance.
Any trees or shrubs dying,
removed, being severely damaged or becoming seriously diseased within five
years of planting shall be replaced with trees or shrubs of such size and
species as may be agreed with the Local Planning Authority.
Reason: In the interests of biodiversity and the
natural environment.
4. External
Materials - Notwithstanding Condition 1, Prior to work starting on site
samples of the proposed materials to be used for the external finishes of the
development hereby granted consent shall be submitted to and approved in
writing by the Planning Authority prior to any work starting on site.
Reason:
In the interests of visual amenity and in order to integrate the
proposal with its surroundings.
5. Sustainable Design – Notwithstanding
Condition 1, Prior to the commencement of development, details of the on-site
micro renewable energy to provide heat or electricity to the property and
details of the use of the final materials – including details of any re-cycled
materials or local sourced materials and their embodied energy for each
materials, shall first be submitted and approved in writing by the Local
Planning Authority. Thereafter the approved micro renewables and materials must
be used in the development hereby approved.
Reason: In order to ensure compliance with
LDP2 Policy 09 and to ensure the building is being as energy efficient as
possible in order to respond to climate change.
6. Electric Vehicle Charging – Notwithstanding
Condition 1, Prior to the commencement of development, details of the provision
of electric vehicle charge points shall first be submitted and approved in
writing by the Local Planning Authority. Thereafter the electric vehicle charge
points must be available for use in the development hereby approved.
Reason: In order to ensure compliance with
LDP2 Policy 34.
7. Quality homes – Notwithstanding
Condition 1, no development shall commence until details of the proposed
timescale for completion of the approved development have been submitted to and
approved by the Planning Authority. Thereafter, the development shall be
implemented in accordance with the duly approved timescale for completion
unless an alternative timescale for completion is otherwise agreed in writing
with the Planning Authority.
Reason: In order to comply with the
requirements of NPF4 Policy 16F.
8. Trees – Notwithstanding
Condition 1, All retained trees on site shall be protected at all times during
construction in accordance with the British Standard; BS 5837:2012 (Trees in
relation to design, demolition and construction – Recommendations).
Reason:
The landscape features to be protected are important to the appearance
and character of the site and the surrounding area and are required to
successfully integrate the proposal with its surroundings.
9. Potential sources of nuisance – Notwithstanding
Condition 1, Prior to work starting on site identification and assessment of
all potential sources of nuisance, including noise/ vibration, dust, and any
temporary lighting provided, which may cause disturbance to nearby residents
during the demolition / construction process should be undertaken by the
applicant and submitted to and approved by the Planning Authority. This should
include consideration of intended hours of operation, movement of vehicles, use
of plant and storage of equipment and materials on site.
For
all potential sources of nuisance the applicant will be required to provide a
management plan with details of suitable control measures to be put in place so
as to ensure that construction does not cause loss of amenity to local
residents and/or statutory nuisance.
Reason: In order to avoid sources of
nuisance in the interest of amenity.
10. Scottish Water – Notwithstanding
Condition 1, Prior to the commencement of development the developer shall
submit written evidence to the Planning Authority that an agreement with
Scottish Water is in place for the connection of the proposed development to
the public water supply and waste water sewage network.
Reason: In
the interests of public health and to ensure the availability of an adequate
water supply to serve the proposed development.
11. Parking and Turning – The
parking and turning area shall be laid out and surfaced in accordance with the
details shown on the approved plans prior to the development first being
occupied and shall thereafter be maintained clear of obstruction for the
parking and manoeuvring of vehicles.
Reason:
In the interest of road safety.
12. PP - Junction with public road:
Notwithstanding
the provisions of Condition 1, the proposed access shall be formed in
accordance with the Council’s Roads Standard Detail Drawing SD 08/005 Rev. B
(as laid out on approved drawings L(9)2D and L(9)4B) and visibility splays of
2.4m metres to point X by 75.0 metres to point Y from the centre line of the
proposed access. The access shall be surfaced with a bound material in
accordance with the stated Standard Detail Drawing. Prior to work starting on
site the access hereby approved shall be formed to at least base course
standard and the visibility splays shall be cleared of all obstructions such
that nothing shall disrupt visibility from a point 1.05 metres above the access
at point X to a point 0.6 metres above the public road carriageway at point Y.
The final wearing surface on the access shall be completed prior to the
development first being brought into use and the visibility splays shall be
maintained clear of all obstructions thereafter.
Reason:
In the interests of road safety.
Note to Applicant:
The
access shall be constructed and drained to ensure that no surface water is
discharged onto the public road.
13. Bird and Red Squirrel Survey - Notwithstanding
Condition 1, Prior to work starting on site a pre-commencement survey for the
presence of birds and red squirrels on site; shall be carried out by an
appropriately qualified person at the optimum time of year and submitted to and
approved by the Planning Authority. In circumstances where species of interest
are identified as being present, or at risk from construction works, the survey
shall further provide suggested avoidance and or mitigation measures, including
timing constraints, to address such presence or risk. The development shall be
implemented in accordance with the measures identified in the duly approved
scheme.
Reason: In order to establish that the
circumstances of the site have not changed significantly between approval and
implementation of the development for the purpose of protecting natural
heritage assets in the interest of nature conservation.
(Reference: Report by Head of
Development and Economic Growth dated 7 May 2024 and supplementary report
number 1, submitted)